Our Response to COVID-19
Climatec UniversityCultureCareersContact
Services
Services OverviewEnergy ServicesBuilding AutomationSecurity + Life Safety
Industries
Industries OverviewCommercial OfficeData CentersEducationGovernmentHealthcareHospitalityIndustrial & LabPublic Works
Company
Company OverviewOur OfficesNews + Updates
Climatec UniversityCultureCareers
Services
Energy ServicesBuilding AutomationSecurity + LIfe Safety
INDUSTRIES
Commercial office
Data centers
Education
Government
Healthcare
Hospitality
Industrial & lab
Public works
COMPANY
Our officesNews + Updates

Iowa Colony High School

Building Automation

Energy Solutions

Located in Brazoria County, Texas, Alvin Independent School District serves the communities of Alvin, Pearland, and Manvel, encompassing 252 sq miles. With a dedicated faculty/staff of 3,600, a thriving student body of 29,000, and 32 schools, this dynamic school district is experiencing unparalleled growth.

Adding to their educational facilities, Iowa Colony High School opened in 2022, a 9th- 12th grade institution with a capacity to accommodate 2,500 students. This modern campus hosts exceptional amenities, including dedicated Career and Technical Education (CTE) classes seamlessly integrated into the larger CTE campus, an 800-seat auditorium, an attached natatorium, three gymnasiums, competition fields, and support services facilities.

With growth comes challenges, among these hurdles were effectively managing schedules, as the community is granted access to the district's facilities. Additionally, gaining insights into current energy consumption while minimizing any adverse effects on occupants was crucial. These efforts were driven by a desire to create a superior learning environment for their students.

‍

Case Study Video

Hear from our customers

“

Project Solution

Climatec advised the design and construction teams tasked to this project and developed a sophisticated sequence of operations. The mechanical design employed a decoupled outside air system with a third-party dedicated carbon dioxide sensing software. The integration of the CO2 system into the control sequences significantly reduced unnecessary outside air intake, while each classroom enjoys dedicated outside air and temperature control. Through innovative building metering and sub-metering, Alvin ISD is now experiencing real-time energy savings.

The central plant houses 3 centrifugal water chillers, 3 cooling towers, and their associated pumps, complemented by 2 hot water condensing boilers. Climatec also exercises full control over the Natatorium central plant, complete with 2 additional boilers and a heat exchanger expertly regulating pool water temperature.

The scope of Climatec's expertise includes control of 40+ air handlers, an energy recovery unit, seven fan coil units, and a remarkable 400+ terminal units. Climatec also commands exterior lighting, utility metering and sub-metering. The integration of lab valves and indoor air quality has ensured the highest levels of efficiency and sustainability for Alvin ISD.

A future junior high school, that is under construction, will be located on a two-story facility nestled within a 200-acre master-planned site. This ensures the district remains well-equipped to meet growth demand. Together, Climatec and Alvin ISD are fostering an educational environment where excellence flourishes, innovation knows no bounds, and the future is brighter than ever envisioned.

‍

Project Results

Industry
Education
Service
Building Automation
Energy Solutions
Location
Dallas, TX
Mesa, AZ
Las Vegas, NV
Phoenix, AZ
Glendale, AZ
Glendale, AZ
Nationwide
Hollister, CA
Valley Center, CA
Houston, TX
San Diego, CA
Tucson, AZ
San Diego, CA
Plano, TX
Iowa Colony, TX
North Las Vegas, NV
Phoenix, AZ
Santa Clarita, CA
Ontario, CA
Redding, CA
Ramona, CA
New York, NY
Culver City, CA
Arvin, CA
Houston, TX
Bellflower, CA
San Leandro, CA
Holtville, CA
Norco, CA
Castro Valley, CA
Las Vegas, NV
Summerlin, NV
Arlington, TX
Rowland Heights, CA
Glendale, AZ
The Woodlands, TX
Los Angeles, CA
La Jolla, CA
Glendale, AZ
Phoenix, AZ
San Diego, CA
West Hills, CA
San Diego, CA
Los Angeles, CA
Westlake Village, CA
Phoenix, AZ
Phoenix, AZ
Santa Monica, CA
Phoenix, AZ
Phoenix, AZ
Downey, CA
Phoenix Metro Area, AZ
Phoenix, AZ
San Diego, CA
Kern County, CA
Rancho Bernardo, CA
Redondo Beach, CA
Santa Ana, CA
Phoenix, AZ
Los Angeles, CA
San Diego, CA
Santa Ana, CA
San Diego, CA
El Cajon, CA
Fountain Valley, CA
Gilbert, AZ
Project Size
87 Campuses
348,000 sq-ft
Over 15 Facilities
266,000 sq. ft.
151,279 Sq Feet
40,810 sq-ft
334015 sq. ft
348,000 sq-ft
30,000 sq ft.
48 stories | 2,100,000 SF
215,000 SF
5 stories
1.7 million SF
17,500 seat arena
80,000 SF
300,000 SF
45,000 SF
18,000 seat arena
11 acre site, 269 guest rooms
262-bed medical center
204-bed Medical Center
350-bed medical center, 675,000 SF
21 hospital sites in Arizona & California
80,000 SF
16,000 SF
34 stories, 635,000 SF
212 Beds
Technologies
  • Alerton Ascent
  • Integration with Aircuity demand control ventilation system
  • Electricmeters
  • Chillers
  • VFD’s

Related case studies

John C. Lincoln North Mountain
View Case Study
Click to see more
State Farm Stadium
View Case Study
Click to see more
Quest Diagnostics West Hills Campus
View Case Study
Click to see more
View All
Climatec: Merging Buildings & Technology

Home

Culture

Careers

Energy Services

Security + Life Safety

Building Automation

Company

Our Offices

Climatec University

Contact

News + Updates

Notices

Copyright © 2025, Climatec, LLC, All Rights Reserved. The Climatec name, trademarks, and logos are the intellectual property of Climatec, LLC.

Licenses
|
Privacy Statement
|
ADA
|
Company Information
|
Privacy Settings