Our Response to COVID-19

ESPN Studios West

Building Automation

Climatec designed and installed an HVAC digital control system in the new full-fledged broadcast production facility across from Staples Center. The building accommodates 70,000sq ft of production facilities, highlighted by two large high-definition studios: one 7500 sq ft and one 5000 sq ft.

Case Study Video

Hear from our customers

“

Project Solution

The floors also contain supporting television production components, such as control rooms, master control facilities, editing facilities, a screening and newsroom area, and production space. The unique HVAC mechanical systems provide for 100% redundancy of all environmental conditioning. The digital control systems designed and installed by Climatec maintain close tolerance environmental conditions in the studios as well as adjoining control, production, and editing facilities. The project utilizes an Ethernet backbone throughout the facility and is linked to the ESPN Studio facility in Bristol, Connecticut.

Project Results

Industry
Commercial office
Service
Building Automation
Location
Tucson, AZ
Las Vegas, NV
Dallas, TX
Dallas, TX
Mesa, AZ
Las Vegas, NV
Phoenix, AZ
Glendale, AZ
Glendale, AZ
Nationwide
Hollister, CA
Valley Center, CA
Houston, TX
San Diego, CA
Tucson, AZ
San Diego, CA
Plano, TX
Iowa Colony, TX
North Las Vegas, NV
Phoenix, AZ
Santa Clarita, CA
Ontario, CA
Redding, CA
Ramona, CA
New York, NY
Culver City, CA
Arvin, CA
Houston, TX
Bellflower, CA
San Leandro, CA
Holtville, CA
Norco, CA
Castro Valley, CA
Las Vegas, NV
Summerlin, NV
Arlington, TX
Rowland Heights, CA
Glendale, AZ
The Woodlands, TX
Los Angeles, CA
La Jolla, CA
Glendale, AZ
Phoenix, AZ
San Diego, CA
West Hills, CA
San Diego, CA
Los Angeles, CA
Westlake Village, CA
Phoenix, AZ
Phoenix, AZ
Santa Monica, CA
Phoenix, AZ
Phoenix, AZ
Downey, CA
Phoenix Metro Area, AZ
Phoenix, AZ
San Diego, CA
Kern County, CA
Rancho Bernardo, CA
Redondo Beach, CA
Santa Ana, CA
Phoenix, AZ
Los Angeles, CA
San Diego, CA
Santa Ana, CA
San Diego, CA
El Cajon, CA
Fountain Valley, CA
Gilbert, AZ
Project Size
89,000 sq. ft
87 Campuses
348,000 sq-ft
Over 15 Facilities
266,000 sq. ft.
151,279 Sq Feet
40,810 sq-ft
334015 sq. ft
348,000 sq-ft
30,000 sq ft.
48 stories | 2,100,000 SF
215,000 SF
5 stories
1.7 million SF
17,500 seat arena
80,000 SF
300,000 SF
45,000 SF
18,000 seat arena
11 acre site, 269 guest rooms
262-bed medical center
204-bed Medical Center
350-bed medical center, 675,000 SF
21 hospital sites in Arizona & California
80,000 SF
16,000 SF
34 stories, 635,000 SF
212 Beds
Technologies
  • Alerton BACtalk DDC System (BACnet)
  • Liebert System integration
  • WEB Enabled
  • Energy Monitoring
  • Ethernet TCP/IP

Related case studies

First American Financial
View Case Study
Click to see more
Academy Museum of Motion Pictures
View Case Study
Click to see more
Texas Ranger Stadium
View Case Study
Click to see more
View All
Climatec: Merging Buildings & Technology

Copyright © 2026, Climatec, LLC, All Rights Reserved. The Climatec name, trademarks, and logos are the intellectual property of Climatec, LLC.

Licenses
|
Privacy Statement
|
ADA
|
Company Information
|
Privacy Settings