We work closely with municipalities every day and recognize their unique needs, challenges and financial constraints. We also understand that high profile public buildings are themselves statements about the values of a city, its residents, and the people and using these facilities. We take great pride in our resume of HVAC, security, fire-life-safety, and automation solutions for world-class sports arenas, libraries, stadiums and courthouses.

Talking Stick Resort Arena — PHOENIX, AZ

In this project, Climatec BTG was contracted directly with Talking Stick Resort Arena to replace the existing Building Management and Fire System. The project replaced all the DDC controls Fire/Life Safety Systems throughout the facility. Time was always the most important concern; this project had to be finished during the off season when the facility was not heavily utilized.

This meant that Climatec had to work closely with the construction team and the administrative staff to schedule and complete work under budget and ahead of schedule. The design work was coordinated with the electrical engineer (Peterson and Associates) and the City of Phoenix (Tracy Bangor, PE). This project consisted of 100% self performed work by our firm. Services provided for the project were as follows:

  • Provide all equipment for the fire alarm
  • Provide all panel programming and commissioning
  • Provide all terminations at control equipment
  • Provide all AHJ testing and owner training

TECHNOLOGIES

  • Honeywell XL5000 DDC System (LON)
  • Third-party software integration
  • Energy Monitoring
  • Ethernet TCP/IP

GLENDALE ARENA — GLENDALE, AZ

In this project, Climatec was contracted by University Mechanical to install a new Building Management and Fire Alarm System. Time, in this project was always a very important concern; this project had to be finished during the off season, prior to the new hockey season.

For this reason, Climatec had to work closely with the construction team and the arena’s administrative staff to schedule and complete work under budget and ahead of schedule. This project was delivered on time and well within the established budget. The primary roles Climatec served as on this project were:

  • Provide all equipment for the fire alarm
  • Provide all panel programming and commissioning
  • Provide all terminations at control equipment
  • Provide all AHJ testing and owner training

TECHNOLOGIES

  • Alerton BACtalk DDC System (BACnet)
  • Third-party software integration
  • WEB Enabled
  • Energy Monitoring
  • Ethernet TCP/IP

UNIVERSITY OF PHOENIX STADIUM — GLENDALE, AZ

In this project, Climatec was contracted to provide a Building Management and Fire System. The primary roles Climatec served as on this project were design builder, DDC and fire alarm contractor. Cost estimating and value engineering services were provided by Climatec to the customer to ensure the projects costs were within the budget constraints, as well as a state-of –the-art design.

This project consisted of 100% self performed work by our firm. Services provided for the project were as follows:

  • Provide all equipment for the fire alarm
  • Provide all panel programming and commissioning
  • Provide all terminations at control equipment
  • Provide all AHJ testing and owner training

TECHNOLOGIES

  • Honeywell XL5000 DDC System (LON)
  • Third-party software integration
  • WEB Enabled
  • Energy Monitoring
  • Ethernet TCP/IP