A hotel’s value is critically linked to the comfort and security of its guests. From the lobby to the presidential suite, from the parking garage to room access, Climatec solutions are focused on what matters most to the hospitality industry.
Sheraton Hotel — Phoenix, AZ

High rise convention hotel topping out at 31 stories with 1,000 guest rooms, a 6,500 sf fitness center, 80,000 sf of flexible meeting space, 29,000 sf ballroom space, 15,000 sf junior ballroom, with 16 meeting rooms and two boardrooms. We provided both fire alarm and EMS controls for seamless safety and comfort.
THE PHOENICIAN RESORT — PHOENIX, AZ

The Phoenician is one of Arizona largest most luxurious resorts. The building was originally constructed in the late 1980’s and had an existing Honeywell Sentara system. Climatec BTG was challenged to retrofit the Sentara system with an EST3 while keeping the existing system fully functional.
The new EST3 system consisted of an EST3 with audio evacuation, 15 node copper network, 1 Fireworks Graphics Station, 987 signature devices, 287 Genesis strobes, and 1381 Genesis speaker strobes. Climatec BTG installed this system in a phased process. Work was completed in the summer months when the hotel’s occupancy was low. Challenges on this project included short turn over times for areas of construction. The hotel closed down an entire wing for the construction process and our project manager provided daily reports to the resort personnel to ensure a prompt completion. The first phase of this project was turned over to the resort a week ahead of schedule.
FOUR SEASONS HOTEL & SPA — WESTLAKE VILLAGE, CA

Climatec installed an open protocol BACnet building management system in the prestigious new luxury hotel and spa across from Dole corporate headquarters. The system includes over 300 Terminal Units, 33 Air Handling Units, 2 Chillers, 3 Cooling Towers, 3 Boilers, and Kitchen and Laundry system controls.
TECHNOLOGIES
- Alerton BACtalk DDC System (BACnet)
- Modbus software integration
- WEB Enabled
- Energy Monitoring
- Ethernet TCP/IP
UNIVERSAL STUDIOS – GIBSON AMPHITHEATER/CITYWALK UNIVERSAL CITY, CA

Climatec retrofitted the existing antiquated control system with a new Alerton control system at the third-largest theatre in California which seats more than 6000 people. The HVAC system under control includes 6 Air Handling Units, 2 Chillers, 2 Cooling Towers, and a Smoke Purge Exhaust System.
TECHNOLOGIES
- Alerton BACtalk DDC System (BACnet)
- Energy Monitoring
- WEB Enabled
- Smoke Purge System
- Ethernet TCP/IP
- GE/Genetec Omnicast Video • Management System
HARD ROCK HOTEL SAN DIEGO — SAN DIEGO, CA

Climatec provided the Building Automation System for the Hard Rock Hotel in San Diego when the project broke ground in 2006. The hotel consists of conference areas, condominiums, hotel rooms, concert venues, restaurants, and spa.
TECHNOLOGIES
- Alerton BACtalk, BACnet